Interim report and pre-build design - (D3.2): Worn Bio-detector Phase 2
                
    McCluskey, Daniel, Coudron, Loic, Munro, Ian, Lodge, Matthew, Baxter, Richard, Johnston, Ian and Tracey, Mark
  
(2017)
Interim report and pre-build design - (D3.2): Worn Bio-detector Phase 2.
    [Report]
  
  
              
            | Item Type | Report | 
|---|---|
| Date Deposited | 15 May 2025 16:07 | 
| Last Modified | 19 Aug 2025 01:47 |