Interim report and pre-build design - (D3.2): Worn Bio-detector Phase 2
McCluskey, Daniel, Coudron, Loic, Munro, Ian, Lodge, Matthew, Baxter, Richard, Johnston, Ian and Tracey, Mark
(2017)
Interim report and pre-build design - (D3.2): Worn Bio-detector Phase 2.
UNSPECIFIED.
UH.
Item Type | Monograph (UNSPECIFIED) |
---|---|
Date Deposited | 29 May 2025 09:04 |
Last Modified | 29 May 2025 09:04 |